Before commencement of any project, we can provide feasibility and short circuit studies.
  1. The load flow study on the system
     
  2. The load flow study under emergency condition
     
  3. The short circuit study on the system
     
  4. Short circuit study with emergency generators operational only
     
  5. Conduct relay setting and coordination studies
     
  6. Propose the recommended overcurrent settings
     
  7. Harmonic study on soft starter and UPS effect on system power quality